Agrochemicals Production Plant for Northern Europe

Agrochemicals Production Plant for Northern Europe
A renowned North American multinational dedicated to the production of agrochemicals has entrusted Bachiller to design and manufacture drying and homogenization equipment for its plant in Northern Europe.

The supplied equipment consists of a 3.000 l Supradry SDV-030 vacuum dryer, a 5.000 l Supramix MVC-050 homogenizer, a 7.000 l Supramix MVC-070 homogenizer, a heating and cooling system skid-mounted, a vacuum and recovery of solvents system skid-mounted, and the dosing systems from equipment to transportation systems by rotary valves.

Prior to the design and manufacture of the equipment, a set of tests were carried out in the BACHILLER’s Test Center facility in Barcelona. With the operational parameters and the results of the tests, it was possible to validate that the final product met the necessary quality requirements, and it also allowed us to know the behavior of the product once dried, which led to the addition of Supramix homogenizers to the installation, one prior to drying and one later to avoid caking in both cases. The complete report was issued to the client with the information on the process and its evolution.

One of the key factors to gain the client’s trust has been the ability to define the solution, and the BACHILLER’s commitment to the results of the productive capacity of the solution, strengthening this trust with the flexibility and ability to modify the design of this equipment during the manufacturing process, due to the importance of maintaining the dates from the beginning (schedule-driven project), constantly adapting to the newly discovered parameters of the product.

This article is published by

BACHILLER is a Spanish company founded on 1968, dedicated to the design and construction of process equipment and pressure vessels for various industry sectors such as petrochemicals, energy, oil and gas, chemical and fine chemical, pharmacy, cosmetics and food. Headquarters, workshops and pilot plant are located in Parets del Vallés, 20 km from ...

BACHILLER